1st photo
Frame clamped in place so that we could see where to drill the fixation holes

2nd Photo
frame re-drilled and fixation holding plates cut off and re-welded to the appropriate place to fit the chassis rails and then that "yuk" red oxide primer paint

3rd photo
"Voila" the tank is solidly in place bolted at both ends and 4 bolts along the sides
a good solid job with the straps to finish off.

No comments:
Post a Comment